Hunter Transmission Project—Project Control

EnergyCo is seeking to engage suitably qualified suppliers to provide project control services (PCS) to support the development and delivery of the Hunter Transmission Project (HTP). The tender designation is the Hunter Transmission Project—Project Control Services SR4387885076. Three service packages are sought:

  • Project controls management and integration
  • Scheduling
  • Cost advisory

Renewable energy zones (REZS)

The NSW Government’s Electricity Strategy and Electricity Infrastructure Roadmap has set out a plan to deliver the state’s first five REZs in the Central-West Orana, New England, South-West, Hunter-Central Coast and Illawarra regions to deliver renewable energy network infrastructure. It supports the implementation of the Australian Energy Market Operator’s (AEMO) Integrated System Plan.

REZs are renewable equivalents to traditional coal-powered power stations. They combine generation, transmission, storage and system strength services. They aim to deliver affordable energy to replace existing power stations over the next 15 years.

Hunter Transmission Project

The HTP will provide:

  1. reliable supply of energy to the load centres of Sydney, Newcastle and Wollongong
  2. permanent network solution to address the projected 2025-26 Energy Security Target breach.

HTP1

The first augmentation of HTP (HTP 1) will provide 5GW of additional transmission capacity on the network and is scheduled to be completed by mid 2027. HTP1 is being managed by an integrated project team (IPT) comprising specialist contractors, consultants and EnergyCo personnel.

Project control services for Hunter Transmission Project

EnergyCo is seeking to engage a qualified and experienced team to provide project controls services in the IPT. The focus includes ensuring timely, accurate, and consistent measurement, management, and reporting of project aspects, assuring data quality and integrity for reliable reporting. They need to provide timely and high-quality services, attend meetings, prepare necessary documentation, coordinate with various stakeholders, and develop and implement processes and standards for project controls. The aim is to support the successful development of HTP1, facilitate a smooth transition to delivery, and handle any activities required for the project’s success as directed by EnergyCo.

The closing date of the tender is 18 March 2024. Madrigal has had significant success in professional services projects, project control projects and renewable energy projects and has won major work for our clients. Contact  us for more details.